Optimus Solutions carried out the project design and commissioning of the Ashgabat Airport lighting automation system, which has become the symbol of Turkmenistan and has become the symbol of Turkmenistan, with a 146,500 square meter terminal building, a 50-room airport hotel, a VIP building, a 6000-vehicle capacity parking lot, located on an area of 12 million square meters, which was undertaken by Polimeks İnşaat.